USCENTAF/DE
POWER PLANTS - 750 KW GENERATORS
TENT CITY 750 KW
LOCATION POPULATION IN.USE STATUS LIMFACS/COMMENTS
AL AYN 1150 5 SAT NOTE 1
AL DHAFRA 1950 7 SAT
AL MINHAD 500 3 MAR NOTE 2
BATEEN 550 3 MAR NOTE 3
CAIBO 0 3 SAT NOTE 4
DHAHRAN 950 3 SAT NOTE 5
DIEGO 1450 UNK UNK SAC SUPPORTED
DOHA 700 3 SAT
JEDDAH 0 0 SAT NOTE 6
KHAMIS 0 0 SAT NOT REQUIRED
K. FAHD 2350 10 SAT 1 SOURCED
K. KHALID 300 0 SAT TACTICAL GEN ONLY
MASIRAH 700 2 MAR 1 SOURCED
RIYADH 600 4 SAT
SEEB 600 2 SAT 2 REQUIRED
SHAIKH ISA 1150 3 SAT 1 REQUIRED
SHARJAH 200 2 MAR NOTE 7
TABUK 0 0 SAT NOT REQUIRED
TAIF 700 5 SAT
THUMRAIT 1950 7 SAT
TOTAL 16000 62
AL: CONNECT TO COMMERCIAL POWER. RETAIN ORGANIC ASSETS FOR
BACK-UP.
NOTE 1: FOUR OPERATIONAL 750KW DIESELS ON SITE. CEMIRT DEPLOYED
W/SOLAR GENERATOR DURING LAST WEEK'S POWER OUTAGE. SOLAR
UNDERCARRAGE DAMAGED DURING TRANSIT AND REMAINS AT AL AYN.
THIS WAS FIRST DEPLOYMENT OF SOLARS IN SWA AND UNABLE TO GET
UNIT RUNNING ON A SUSTAINED BASIS EVEN W/CEMIRT'S HELP. LONGEST
RUNNING PERIOD WAS ONLY FOUR HOURS.
NOTE 2: SITE BORROWED A HOST NATION FUEL TRUCK TO SUPPLY FUEL TO
750'S. STILL AWAITING FUEL BLADDERS SOURCED BY LG.
NOTE 3: ONE 750 KW DIESEL HAS SYMPTOMS OF FAILING FUEL INJECTORS.
CEMIRT DEPLOYING WITH REPLACEMENT AND BRINGING BAD UNIT BACK
TO THUMRAIT FOR REPAIR.
NOTE 4: THREE DIESELS SHIPPED FROM THUMRAIT AND SOLARS SENT TO
ASPEN. RELIABILITY OF SOLARS IN SWA TOO RISKY TO CHANCE AT A
SITE ISOLATED FROM MAIN SUPPLY HUB.