                                  POWER PLANTS - 750 KW GENERATORS
         
         
         
                      	        TENT CITY       750 KW
         LOCATION     POPULATION  IN.USE     STATUS     LIMFACS/COMMENTS
         
         AL AYN  	1150         	5    	     SAT         NOTE 1
         AL DHAFRA	1950        	7    	     SAT
         AL MINHAD	  500            	3    	    MAR         NOTE 2
         BATEEN   	  550         	3    	    MAR         NOTE 3
         CAIBO      	     0         	3    	     SAT         NOTE 4
         DHAHRAN  	  950         	3    	     SAT         NOTE 5
         DIEGO   		1450       	UNK         UNK        SAC SUPPORTED
         DOHA     	  700        	3    	     SAT
         JEDDAH     	     0         	0    	     SAT         NOTE 6
         KHAMIS    	     0         	0    	     SAT         NOT REQUIRED
         K. FAHD 	2350               10    	     SAT         1 SOURCED
         K. KHALID	  300         	0    	     SAT         TACTICAL GEN ONLY
         MASIRAH 	  700         	2    	     MAR        1 SOURCED
         RIYADH   	  600        	4    	      SAT
         SEEB    		  600         	2    	      SAT         2 REQUIRED
         SHAIKH ISA 	1150       	3    	      SAT         1 REQUIRED
         SHARJAH  	  200         	2    	     MAR         NOTE 7
         TABUK      	     0         	0      	      SAT         NOT REQUIRED
         TAIF     		 700         	5    	      SAT
         THUMRAIT	1950         	7    	      SAT
         
         TOTAL  	          16000               62
         
         AL:  CONNECT TO COMMERCIAL POWER.  RETAIN ORGANIC ASSETS FOR 
BACK-UP.
         
 NOTE 1:  FOUR OPERATIONAL 750KW DIESELS ON SITE.  CEMIRT DEPLOYED 
	W/SOLAR GENERATOR DURING LAST WEEK'S POWER OUTAGE.  SOLAR 
	UNDERCARRAGE DAMAGED DURING TRANSIT AND REMAINS AT AL AYN.  
	THIS WAS FIRST DEPLOYMENT OF SOLARS IN SWA AND UNABLE TO GET 
	UNIT RUNNING ON A SUSTAINED BASIS EVEN W/CEMIRT'S HELP.  LONGEST 
	RUNNING PERIOD WAS ONLY FOUR HOURS.
         
NOTE 2:  SITE BORROWED A HOST NATION FUEL TRUCK TO SUPPLY FUEL TO 
	750'S. STILL AWAITING FUEL BLADDERS SOURCED BY LG.
         
NOTE 3:  ONE 750 KW DIESEL HAS SYMPTOMS OF FAILING FUEL INJECTORS.  
	CEMIRT DEPLOYING WITH REPLACEMENT AND BRINGING BAD UNIT BACK 
	TO THUMRAIT FOR REPAIR.
         
NOTE 4:  THREE DIESELS SHIPPED FROM THUMRAIT AND SOLARS SENT TO 
	ASPEN.  RELIABILITY OF SOLARS IN SWA TOO RISKY TO CHANCE AT A 
	SITE ISOLATED FROM MAIN SUPPLY HUB.
         