NOTE 5: A CEMIRT PDC "DEVICE" SHIPPED TO REPLACE REGULAR PDC WHICH
HAD A FIRE. THREE OUT OF FOUR BANKS STILL OPERATIONAL BUT WILL
BE SWAPPED DURING NEXT SCHEDULED OUTAGE.
NOTE 6 : FOUR DIESEL 750'5 HELD AT THUMRAIT BY LG TO FILL POTENTIAL 1,500
POPULATION CAMP.
NOTE 7: CCC SOURCED FOR SITE NEVER ARRIVED. LG NOW SOURCING PDC
DEVICE AND CEMIRT WILL DEPLOY WITH UNIT TO HELP SET-UP AND
TRAIN POWER PRODUCTION TECHNICIANS ON PROPER USE OF ASSETS.
50 KW DIESEL GENERATOR STATUS W/CEMIRT AT THUMRAIT
19 UNITS LOAD TESTED AND READY
2 UNITS UNDER MAINTENANCE
ASSET SUMMARY:
HARVEST FALCON IN AF INVENTORY: UNK
HARVEST FALCON IN PREPO ON 7 AUG 90: UNK
HARVEST FALCON SHIPPED FROM CONUS: UNK
AS OF 20 OCT 90
OPR: [(b)(2)]