Document Page: First | Prev | Next | All | Image | This Release | Search

File: aaawk_08.txt
Page: 08
Total Pages: 31

NOTE 5: TWO 750KW DIESEL GENERATORS SHIPPED TO CEMIRT AT THUMRAIT FOR 
REPAIR.CURRENTLY ABLE TO,MEET POWER LOADS SINCE WE ARE BETWEEN COOLING 
AND HEATING SEASONS. 2 GENERATORS WILL BE FORWARDED TO SITE WHEN BROKEN 
UNITS ARRIVE AT THUMRAIT. 
 
NOTE 6: SITE CURRENTLY OPERATING ON FIVE (MEP-6) GENERATORS. TWO WORKING 
MEP-7'S SHIPPED TO REPLACE BROKEN MEP-7'S THAT CAME WITH MEDICAL EQUIPMENT. 
 
NOTE 7: ONE 750KW INOP AND CANNIBALIZED. SITE HAS NOT RECEIVED WRSK KIT. 
PREPARING THE BROKEN 750 FOR SHIPMENT FOR DEPOT REPAIR (THUMRAIT). 
 
ASSET SUMMARY: 
HARVEST FALCON IN AF INVENTORY: UNK 
HARVEST FALCON IN PREPO ON 7 AUG 90: UNK 
HARVEST FALCON SHIPPED FROM CONUS: UNK 
 
 
							AS OF 24 NOV 90 
							OPR: [(b)(2)] 
	

Document Page: First | Prev | Next | All | Image | This Release | Search