POWER PLANTS - 750 KM GENERATORS

		ELEC ASSETS 		750 KW
LOCATION	FOR POP OF 		ON SITE	STATUS	LIMFACS/COMMENTS

AL AYN	1200			4 		SAT
AL DHAFRA	2500			8 		SAT
AL KHARJ	44006 			N/R				NOTE 1
AL MINHAD	950			3 		MAR		NOTE 2
BATEEN	1100			5		SAT
CAIRO		1100			4 		SAT
DHAHRAN	1200			2 		MAR		NOTE 3
DOHA		1000			3 		SAT
JEDDAH	0			0 		SAT		NOTE 4
KHAMIS	0			0 		SAT		NOT REQUIRED
K. FAHD	4400			8 		SAT		NOTE 5
K. KHALID IAP 400			0 		MAR		NOTE 6
KKMC		600			2		 SAT
MASIRAH	1000			2 		SAT
RIYADH	850			4 		SAT		NOTE 7
SEEB		1500			2 		SAT
SHAIKH ISA	1500			3 		MAR		NOTE 8
SHARJAH	400			2		 SAT
TABUK		0			0 		SAT		NOT REQUIRED
TAIF		1150			5		 SAT
THUMRAIT	2650			7 		SAT

TOTAL		29330			70

GOAL: CONNECT TO COMMERCIAL POWER. RETAIN ORGANIC ASSETS FOR BACK-UP.

NOTE 1: POWER PLANT STILL BEING SET-UP. THIS IS THE FIRST LARGE SCALE USE OF
SOLARS IN SWA FOR DESERT SHIELD.

NOTE 2: SITE BORROWED A HOST NATION FUEL TRUCK TO SUPPLY FUEL TO 750'S. STILL
	AWAITING FUEL BLADDERS. REQUIREMENT REIDENTIFIED TO USCENTAF/LG
	FORWARD.
	
NOTE 3: 750KW DIESEL GENERATOR SHIPPED TO THUMRAIT FOR REPAIR OF SEIZED 
	ENGINE.
NOTE 4: AIR TRANSPORTABLE HOSPITAL (ATM) AT THIS SITE ARRIVED WITH TWO INOP
	100KW (MEP-7B) GENERATORS. THESE GENERATORS ARE BRAND NEW AND HAVE
	BEEN PULLED FROM THEIR FACTORY SHIPPING CONTAINERS AND WILL NOT
	OPERATE. SO FAR CEMIRT HAS BEEN TO EACH SITE WHERE THESE GENERATORS
	HAVE BEEN DEPLOYED TO FIX THEM. THIS SITE HAS ELECTED TO KEEP THEIR
	ATH AND AEROMEDICAL STAGING FACILITY (ASF) ON TACTICAL GENERATOR 
	UNTIL THEY CAN CONNECT TO COMMERCIAL POWER. ALSO, A MEP-7 SUPPORTING 
	COMM OPS FOR THE SITE IS BEING SHIPPED TO THUMRAIT FOR CEMIRT REPAIR OF
	LEAKING REAR ENGINE SEAL.