Document Page: First | Prev | Next | All | Image | This Release | Search
File: aaawl_08.txtNOTE 5: TWO 750KW DIESEL GENERATORS SHIPPED TO CEMIRT AT THUMRAIT FOR REPAIR. CURRENTLY ABLE TO MEET POWER LOADS SINCE WE ARE BETWEEN COOLING AND HEATING SEASONS. 2 GENERATORS WILL BE FORWARDED TO SITE WHEN BROKEN UNITS ARRIVE AT THUMRAIT. NOTE 6: SITE CURRENTLY OPERATING ON FIVE (MEP-6) GENERATORS. TWO WORKING MEP-7'S SHIPPED TO REPLACE BROKEN MEP-7'S THAT CAME WITH MEDICAL EQUIPMENT. NOTE 7: CEMIRT ARRIVED THIS WEEK. REPAIRED ONE 750KW DIESEL GENERATOR AN SWAPPED ANOTHER ONE TO BRING THIS SITE BACK ON LINE. NOTE 8: ONE 750KW INOP AND CANNIBALIZED. SITE HAS NOT RECEIVED WRSK KIT. PREPARING THE BROKEN 750 FOR SHIPMENT FOR DEPOT REPAIR (THUMRAIT). ADDITIONAL COMMENTS RECEIVED COPIES OF AF REG 85-19, "MAINTENANCE AND OPERATION OF ELECTRIC POWER GENERATING PLANTS," THIS WEEK. SUFFICIENT COPIES RECEIVED TO SEND ONE TO EACH SITE. RECEIVED NOTIFICATION FROM STATESIDE CEMIRT THROUGH DEPLOYED CEMIRT THAT FUNDS FOR PARTS PURCHASING BY STATESIDE CEMIRT HAS NOT BEEN RECEIVED TO DATE. REFERENCE USCENTAF/DE/LG/AC MESSAGE 111504Z NOV 90. ASSET SUMMARY: HARVEST FALCON IN AF INVENTORY: UNK HARVEST FALCON IN PREPO ON 7 AUG 90: UNK HARVEST FALCON SHIPPED FROM CONUS: UNX AS OF 8 DEC 90 OPR: [(b)(2)]
Document Page: First | Prev | Next | All | Image | This Release | Search