Document Page: First | Prev | Next | All | Image | This Release | Search
File: aaawl_17.txtUS CENTAF/ DE CRITICAL EQUIPMENT STATUS - RAPID RUNWAY REPAIR PRIMARY THREAT LOCATION AIRCRAFT PRIORITY STATUS LIMFACS/COMMENTS AL AYN C-130 AL DHAFRA F-16 AL KHARJ -15/16 AL MINHAD F-16 BATEEN C-130 CAIRO KC-135 DHAHRAN F-15 5 UNSAT SEE NOTES 2 + 7 DOHA F-16 4 UNSAT SEE NOTES 3 + 7 JEDDAH KC-135 KHAMIS [(b)(1) sec 3.4 (b)(5)] K. FAHD A-10 2 UNSAT SEE NOTES 4 + 7 K. KHALID KC-135 KKMC NONE 1 UNSAT SEE NOTES 1 + 7 MASIRAH C-130 ' RIYADH E-3A SEEB KC-135 SHAIKH ISA F-4G 3 UNSAT SEE NOTES 5 + 7 SHARJAH C-130 TABUK F-15 6 UNSAT SEE NOTES 6 + 7 TAlF F-111 THUMRAIT F-15 NOTE 1: NEW REQUIREMENT. THIS BASE IS CURRENTLY SCHEDULED TO GET TRANSIENT MAC FLIGHTS AND POSSIBLY FUNCTION AS AN FOL FOR A-10 AIRCRAFT. MAY ALSO BE USED AS AN ALTERNATE RECOVERY BASE FOR FIGHTER AIRCRAFT SINCE SITE IS NEAR KUWAIT BORDER. THE FFGM KIT NOW POSITIONED AT RIYADH, AND ORIGINALLY PROGRAMMED FOR DOHA, WILL BE DIVERTED TO KKMC UPON COMPLETION OF THE TRAINING CLASSES. NOTE 2: TWO FFGM KITS (EACH KIT HAS 4 MATS WHICH EQUATES TO TWO 54 X 60 FT PATCHES) SHIPPED FROM CONUS ON 24 OCT 90 AND ARRIVED AT TABUK. ONE KIT PROGRAMMED TO MOVE FROM TABUK TO DHAHRAN BUT DATE NOT YET ESTABLISHED. BRITISH ROLLED MAT SYSTEM AVAILABLE BUT US BCE PERSONNEL NOT TRAINED TO USE. NOTE 3: LGS WORKING SHORTFALL OF AM-2 MAT SYSTEM FOR THIS SITE. SITE IS THE NEXT SCHEDULED LOCATION,FOR A FIBERGLASS MAT KIT NOW BEING PRODUCED. NOTE 4: AM-2 MAT SYSTEM ARRIVED 6 OCT 90. CURRENTLY MISSING 6-6 FOOT KEYLOCKS (5680-00-132-1730) AND 32 GREEN AND 64 RED LIGHT MARKER LENSES (6210-00-548-0129); ITEMS ORDERED THROUGH LOCAL LGS. NOTE 5: 77 BUNDLES OF AM-2 MATTING BEING MOVED FROM DHAHRAN TO FLESH OUT TOTAL REQUIREMENT OF 81. AM-2 MAT COMPONENT AND PATCH KITS ARE ON SITE (5 OCT 90). MAJORITY OF RRR VEHICLES AND HEAVY EQUIPMENT ALSO ON SITE.
Document Page: First | Prev | Next | All | Image | This Release | Search