Document Page: First | Prev | Next | All | Image | This Release | Search

File: aaawl_17.txt
Page: 17
Total Pages: 32

US CENTAF/ DE
CRITICAL EQUIPMENT STATUS - RAPID RUNWAY REPAIR

		PRIMARY 	THREAT
LOCATION 	AIRCRAFT	 PRIORITY 	STATUS 	LIMFACS/COMMENTS

AL AYN	C-130
AL DHAFRA 	F-16
AL KHARJ	-15/16
AL MINHAD 	F-16
BATEEN	C-130
CAIRO		KC-135
DHAHRAN	F-15		5		UNSAT 	SEE NOTES 2 + 7
DOHA		F-16		4		UNSAT		SEE NOTES 3 + 7
JEDDAH	KC-135
KHAMIS 	[(b)(1) sec 3.4 (b)(5)]
K. FAHD	 A-10		2		UNSAT 	SEE NOTES 4 + 7
K. KHALID 	KC-135
KKMC 		NONE		1		UNSAT 	SEE NOTES 1 + 7
MASIRAH 	C-130 '
RIYADH	E-3A
SEEB 		KC-135
SHAIKH ISA	 F-4G		3		UNSAT 	SEE NOTES 5 + 7
SHARJAH	C-130
TABUK		 F-15		6		UNSAT 	SEE NOTES 6 + 7
TAlF		 F-111
THUMRAIT 	F-15

NOTE 1: NEW REQUIREMENT. THIS BASE IS CURRENTLY SCHEDULED TO GET
TRANSIENT MAC FLIGHTS AND POSSIBLY FUNCTION AS AN FOL FOR A-10
AIRCRAFT. MAY ALSO BE USED AS AN ALTERNATE RECOVERY BASE FOR
FIGHTER AIRCRAFT SINCE SITE IS NEAR KUWAIT BORDER. THE FFGM KIT
NOW POSITIONED AT RIYADH, AND ORIGINALLY PROGRAMMED FOR DOHA, WILL
BE DIVERTED TO KKMC UPON COMPLETION OF THE TRAINING CLASSES.

NOTE 2: TWO FFGM KITS (EACH KIT HAS 4 MATS WHICH EQUATES TO TWO 54 X 60 FT
PATCHES) SHIPPED FROM CONUS ON 24 OCT 90 AND ARRIVED AT TABUK.
ONE KIT PROGRAMMED TO MOVE FROM TABUK TO DHAHRAN BUT DATE NOT YET
ESTABLISHED. BRITISH ROLLED MAT SYSTEM AVAILABLE BUT US BCE
PERSONNEL NOT TRAINED TO USE.

NOTE 3: LGS WORKING SHORTFALL OF AM-2 MAT SYSTEM FOR THIS SITE. SITE
IS THE NEXT SCHEDULED LOCATION,FOR A FIBERGLASS MAT KIT NOW BEING
PRODUCED.

NOTE 4: AM-2 MAT SYSTEM ARRIVED 6 OCT 90. CURRENTLY MISSING 6-6 FOOT
KEYLOCKS (5680-00-132-1730) AND 32 GREEN AND 64 RED LIGHT MARKER
LENSES (6210-00-548-0129); ITEMS ORDERED THROUGH LOCAL LGS.

NOTE 5: 77 BUNDLES OF AM-2 MATTING BEING MOVED FROM DHAHRAN TO FLESH OUT
TOTAL REQUIREMENT OF 81. AM-2 MAT COMPONENT AND PATCH KITS ARE ON
SITE (5 OCT 90). MAJORITY OF RRR VEHICLES AND HEAVY EQUIPMENT
ALSO ON SITE.

Document Page: First | Prev | Next | All | Image | This Release | Search