USCENTAF/DE
 
POWER PLANTS - 750 KW GENERATORS 
 
		ELEC ASSETS		 750 KW 
LOCATION	FOR POP OF 		IN USE		STATUS	LIMFACS/COMMENTS 
 
AL AYN	1200			4 		SAT		NOTE 1 
AL DHAFRA	2500			7		SAT 
AL KHARJ	20			0 		SAT		NOT REQUIRED 
AL MINHAD	950			3 		MAR		NOTE 2 
BATEEN	1100			3 		SAT 
CAIRO		1100			3 		SAT 
DHAHRAN	1200			2		MAR		NOTE 3 
DOHA		1000			3		SAT 
JEDDAH	0			0		SAT		NOTE 4 
KHAMIS	0			0 		SAT		NOT REQUIRED 
K. FAHD	4400			1		0 SAT		1 SOURCED 
K. KHALID	400			0 		MAR		NOTE 5 
MASIRAH	1000			2 		SAT 
RIYADH	850			4		SAT 
SEEB		1500			2 		SAT		NOTE 6 
SHAIKH ISA	1500			3 		SAT 
 SHARJAH	400			2		MAR		NOTE 7 
TABUK		0			0 		SAT		NOT REQUIRED 
TAIF		1150			5		 SAT 
THUMRAIT	2650			7		 SAT
 
TOTAL		24350			60 
 
GOAL: CONNECT TO COMMERCIAL POWER. RETAIN ORGANIC ASSETS FOR BACK-UP. 
 
NOTE 1: ONE SOLAR GENERATOR (TURBINE 750KW) STILL BROKEN DOWN AT THIS SITE. 
	THIS WAS THE FIRST DEPLOYMENT OF A SOLAR GENERATOR FOR SWA AND IT 
	ONLY RAN FOR A MAX OF FOUR HOURS EVEN WITH CEMIRT TEAM ON SITE. 
	CEMIRT PRESENTLY ON SITE REPAIRING THIS SOLAR FOR RETURN TO THUMRAIT 
	FOR ADDITIONAL REPAIRS. 
 
NOTE 2: SITE BORROWED A HOST NATION FUEL TRUCK TO SUPPLY FUEL TO 750'S. STILL 
	AWAITING FUEL BLADDERS SOURCED BY LG. 
 
NOTE 3: GENERATOR SHIPPED TO THUMRAIT FOR REPAIR OF SEIZED ENGINE. 
 
NOTE 4: FOUR DIESEL 750'S HELD AT THUMRAIT BY LG TO FILL POTENTIAL 1,500 
	POPULATION CAMP. 
 
NOTE 5: SITE CURRENTLY OPERATING ON FIVE 60KW DIESEL (MEP-6) GENERATORS.