NOTE 6: SITE CURRENTLY HAS POWER LOAD FOR TWO 750KW'S BUT LOAD WILL DOUBLE 
ONCE POPULATION ARRIVES TO SUPPORT 250 BED AIR TRANSPORTABLE HOSPITAL. 
 
NOTE 7: CCC SOURCED FOR SITE NEVER ARRIVED. LG NOW SOURCING PDC DEVICE AND 
CEMIRT WILL DEPLOY WITH UNIT TO HELP SET-UP AND TRAIN POWER PRODUCTION 
TECHNICIANS ON PROPER USE OF ASSETS. 
 
50KW DIESEL GENERATOR STATUS W/CEMIRT AT THUMRAIT 
 
	17 UNITS LOAD TESTED AND READY 
	2 UNITS UNDER MAINTENANCE
 
ASSET SUMMARY: 
	HARVEST FALCON IN AF INVENTORY: UNK 
	HARVEST FALCON IN PREPO ON 7 AUG 90: UNR 
	HARVEST FALCON SHIPPED FROM CONUS: UNK
 
AS OF 3 NOV 9 0 
OPR: [(b)(2)]