Document Page: First | Prev | Next | All | Image | This Release | Search
File: aaawo_37.txtUSCENTAF/DE CRITICAL ISSUE SUBJECT: BEDDOWN STATUS OF AL KHARJ AB, S.A. AIRLIFT: Aircraft continue to arrive with cargo on a daily basis. AIRFIELD: Airfield pavements in operational condition including airfield lighting. Three runway sweepers on site. PAPI system operational and has been flight checked. Portable TACAN is operational. Portable tower is operational. ARRESTING BARRIERS: The runway has two BAK-9, two BAK-14 and two net barriers which have not been certified. One MAAS installed on runway, 2000 feet from threshold, north end. A second MAAS installed but needs cable and tape. A third MAAS is on-hand and will be installed on taxiway for an alternate runway. FIRE PROTECTION: Satisfactory. Five P-l9's, two P-13's, one P-20 and one P-10 on site. Three P-18's and one P-19 sourced. 48 fire fighters on site. 10 additional at Thunrait. They will move when aircraft leave Thumrait. WATER STORAGE: The local host nation storage, treatment and distribution system cannot be charged as there is no pumping station yet. Twenty-six storage bladders (20,000 gallon) are required. All bladders to be installed and filled as soon as available. 12 20,000 gallon bladders on-hand. Three filled with non-potable, one filled with potable. FUEL STORAGE: Six sets of berms are complete now and others are under construction. Sixteen 50,000 Gal bladders are now full and four additional are ready to be filled. An additional 8 bladders will be ready to be filled by 16 Dec 90. POWER: No commercial power is available. 14 solar turbine generators are on-hand (750 KW) and being used for high voltage power. Power plant for cantonment area is up and running. Flightline power plant should be on line by 20 Dec 90. CANTONMENT AREA: RED HORSE, Prime BEEF, and a Saudi contractor are working 24-hours a day in shifts. Site prep and graded clay roads have an ECD of 20 Dec 90. 264 billeting tents and 50 admin tents are now erected. SERVICES: 2 MKT's operational serving 2 hot meals and one MRE with supplements for lunch. B-rations, MRE's for 30 day supply arrived 15 Dec 90. First meal scheduled to be served out of double 9-1 on 16 Dec 90, second double 9-1 to be serving by 22 Dec 90. PERSONNEL: Prime BEEF - 150 (90 Thumrait, 60 Holloman) RED HORSE - 25 Prime RIBS - 97 (Thumrait)
Document Page: First | Prev | Next | All | Image | This Release | Search