Document Page: First | Prev | Next | All | Image | This Release | Search

File: aabfp_10.txt
Page: 10
Total Pages: 14

10     014              291530Z   DEC  90         PP     PP                                              CC1830L

(B)  3 EA GP SHELTERS ON HAND AND IN USE.

(C)  4 EA ESC SHELTERS ON HAND AND IN USE.

G.  SUPPLY.

{1} A PORTION OF OUR CONSUMABLE-WAR RESERVE SPARE KITS {WRSK}

REPLACEMENT HAS ARRIVED.  OUR AGE MICAPS SHOULD BE HELPED WHEN THE

REST OF THE WRSK ARRIVES
.
{2}  OUR CHANGING TO THE STANDARD BASE SUPPLY SYSTEM {SBSS} LINK TO

LANGLEY AFB HAS BEEN HAMPERING OUR MICAP FILL RATE. HOPEFULLY THIS

WILL GET BETTER.   OUR MICAPS HAVE JUMPED FROM THE LOW TWENTIES TO

THE LOW THIRTIES.

{3} AS PREDICTED WE HAVE EXPERIENCED OUR FIRST ALR-56C LINE

REPLACEMENT UNIT {LRU} MICAP. WE ARE MICAP FOR AN LRU-9 COMMON TO

B0TH NON-PREPLANNED PRODUCT IMPROVEMENT {NON-P3I} AND P3I VARIANTS

OF ALR-56C.   WE ARE ALSO NEARING A SHORTAGE OF LRU-6C WHICH IS ALSO

COMMON TO BOTH SYSTEMS.  REQUEST HELP IN REFILLING OUR STOCK OF

LRU-9'S {NSN 5865-01-089-1745} AND LRU-6C {NSN 5865-0l-179-9699}.

OUR STATUS ON LRU-6C'S IS EIGHT AUTHORIZED. TWO ON HAND.   THE LRU-9

STATUS IS TWO AUTHORIZED,. ZERO ON HAND.   IN EW MST DIV/LN MO  P

2118442 DEC 90, WARNER ROBINS ALC INDICATED OUR REQUISITIONS ARE NOT

AUTOMATICALY OVERLAYED INTO-THE D035 SYSTEM. REQUEST THE CSSA



			.	

RNP

Document Page: First | Prev | Next | All | Image | This Release | Search