Document Page: First | Prev | Next | All | Image | This Release | Search

File: aabfp_11.txt
Page: 11
Total Pages: 14

11     14         291530Z  DEC 90          PP     PP                                                       CC1830L


INQUIRE WR-ALC IF OUR REQUISITIONS HAVE FLOWED INTO D035.

(4)  DURING A RECENT AIR RAID WARNING E5, A PORTION OF OUR

POPULATION OPENED AND DONNED THEIR CWDE GEAR.  BASED ON HQ AFLC/BS

MSG 04161635Z OCT 90,  INTERIM GUIDANCE ON SERVICE LIFE OF THE

CHEMICAL PROTECTIVE OVERGARMENT (CPO) AND THE BATTLE DRESS

OVERGARMENT (BDO) WE ARE NOW REQUIRED TO REPLACVE THIS GEAR.  RESEAL

THE OVERGARMENTS AND PLACE THEM IN RESERVE FOR USE AFTER OPERATIONAL

STOCK IS DEPLETED.  YOU WILL SEE A SIGNIFICANT REQUISITION OF CWDE

SUITS WITHIN OUR SBSS RECORDS FOR REPLAVCEMENT GEAR AND A TEN PERCENT

RESERVE FOR SIZING.

6.   COMMUNICATIONS AND CONNECTIVITY.

A.  SIGNIFICANT OUTAGES:

     [(b)(1) sec 3.4(b)(4)]

{2} 27 DEC 90:   GMVB AUTODIN CIRCUIT WAS DOWN FOR ONE HOUR. 0930Z

TO 1030Z. THE PROBLEM WAS AN ENVIRONMENTAL CONTROL UNIT AT THE

DISTANT END.
					.			.		.	-
[(b)(l) sec 3.4(b)(4)]













RNP

Document Page: First | Prev | Next | All | Image | This Release | Search