Document Page: First | Prev | Next | All | Image | This Release | Search

File: 120596_aacnq_24.txt
Page: 24
Total Pages: 27

          DEPT OF THE AIR FORCE					20 DECEMBER 1990
         354 TFW (DEPLOYED)

                               		AIR BASE OPERABILITY
         			DECONTAMINATION/CONTAINATION AVOIDANCE
         					PLAN

         1. PURPOSE: To establish a concept of operations for chemical
         agent decontamination and contamination avoidance.

         2. CONCEPT OF OPERATIONS: Decontamination will be primarily
         user oriented utilizing expedient methods and contamination
         avoidance procedures. Expected agents are non-persistent (4-12
         HOURS) in the present environment, but with weather changes,
         could extend upward to 77 hours or more. If more detailed con-
         termination is required, specialized teams are formed in mainte-
         nance, munitions, transportation, civil engineers, and medical.
         Decontamination tasking/guidance is provided in the base decon
         plan.

         3.  GENERAL TASKING:            

              a. 23rd/354 TFW/MA will man and equip the following teams:

                	1) Munitions Decon
                	2) Aircraft Decon
             		3) AGE

         	b. 354th CSE/DE will equip and man an Area Decon Team and
         	will be responsible for RRR equipment decon.

              c. 354th TFW/LGT will equip and man a vehicle Decon Team.

	d. 1st SOW/MA will man and equip the following teams:         
                	1) Munitions
                	2) Aircraft
                	3) AGE

         	e. All units will be responsible for expedient decontamina-
        	tion of owner/user vehicles and equipment.

         4. DECONTAMINATION LOCATIONS: Decontamination Teams must
         identify primary, secondary, and tertiary locations. Water
         availability must be considered when choosing locations. To
         facilitate relocation, mobile decon teams should be considered.

         5. COMMAND AND CONTROL: Decontamination operations other than
         owner/user level will be as directed and prioritized by the SRC/CC.


					21

Document Page: First | Prev | Next | All | Image | This Release | Search