resulting from the situation and develop guidance to
address those problems.
11. To assess and report on the contract bet@een OKI and.
the Kuwait Goverrment (MPW)..
APPROACH: The general approach was to gather and
assimilate information from various sources including written
reports, interviews, observations and other sources.
Engineering reports prepared at the request of the Ministry of
public Works prior to the invasion were especially helpful in
understanding the pro-invasion condition of the sewage
collection and treatment systems. interviews with Mahmoud
Karam, OMX personnel, and Capt. Ouellette were especially
helpful in understanding the existing sewage system and the
related water supply system. observations were made at the
three major sewage treatment plants, numerous pump stations
and by-pass locations within the collection system during'.
travel throughout Kuwait City.
Our approach also included presenting 'our plans,
objectives, progress and'schedule to KERO.and DRAO management
for review and comment. We also presented our plan,
objectives, and preliminary conclusions in meetings with His
Excellency Abdulla Al Qatami, Minister of Public Works, and
Mr. Al Fozan.
CRZTXCAT. OBSERVATRONS: We were hampered in our efforts
to assess recovery progress by the lack of a satisfactory
initial damage assessment. "Stove piping" management of
recovery efforts impeded our gathering of information in
related areas of water supply, population return projections,
efforts. We believe a situation
room or center is, and would have been earlier-, of great value
in recovery efforts. Initial efforts to obtain information
and coordinate with "the steering committee" of the MPW were
difficult at best-- this situation has gradually improved-as
(opinion) our -credibility has 'increased with committee
members.
2 0
14
Box ID = BX000000
Unit = CONST ENG LABS
Parent Organization = CORPS OF ENGS
Folder Title = SANITARY SEWAGE SYSTEM RECOVERY ASSESSMENT
Subject = SANITARY SEWAGE SYSTEM RECOVERY ASSESSMENT
Document Number = 129
Image file name = 00000021.tif
Document Page: First | Prev | Next | All | Image | This Release | Search