                 collection system during "normal', times (pre-invasion). The
                 oversights in design include inadequate grit removal, no flow
                 measurement on the inf 3,uent ..manpower intensive provisions for
                 sludge handling (shovel and wheelbarrow at Ardiya) . and
                 assumed inadequate construction - specif icati6ns related to
                 materials uE;6d in control gates, conveyance channels,, and
                 quality assurance during 'construction. Ardiya STP is less
                 than 30 years old, and it looks to be more than 50 years old.
                 The sewer system has obvious problems in that 90% of the sewer
                 lines are asbestos-cement pipe and should all be replaced with
                 piping more appropriate to the sewer system conditions, i.e.,
                 low f lows, extremely long residence times, anaerobic
                 conditions, and resulting unusually corrosive conditions.































                                                39                                4 5
Box ID = BX000000
Unit = CONST ENG LABS  
Parent Organization = CORPS OF ENGS   
Folder Title = SANITARY SEWAGE SYSTEM RECOVERY ASSESSMENT                                                      
Subject = SANITARY SEWAGE SYSTEM RECOVERY ASSESSMENT
Document Number =        129
Image file name = 00000046.tif

Document Page: First | Prev | Next | All | Image | This Release | Search