Document Page: First | Prev | Next | All | Image | This Release | Search

File: 081296_jun96_decls7_0129.txt
Page: 0129
Total Pages: 143

Subject: FRAGO 1 91 31 7TH ENG BDE OPORD 1 91 TTH ENG BDE 2 JAN 91       

Box  ID: BX000213

Document Number:          3

Folder Title: 7TH ENG BDE  FRAGOS  001-91 THROUGH 1-91-72                                                     

Folder Seq #:         13

Unit: VII CORPS   

Parent Organzation: ARCENT      





                                   UNCLASSIFIED







            FRAGO 7-91 to 7th Engr Ede OPLAN 5-90


                     (1)       Maneuver. 7th Engr Bde defends and retains BP
            NIXON as part of the IID defense. Additional maneuver units are
            deployed as they become available to the Brigade.

                     (2)       Fires. Initially, none are available during
            the 1ID defense. Upon closure of 1 ID DIVARTY, GS or reinforcing
            fires will be available to the Brigade.

                     (3)       Counterair. Primary means is defensive fighter
            aircraft. TF B-43 will provide HIMAD support using HAWI@ and
            PATRIOT units near LOGBASE ALPA.


                     (4) (U) Engineer.

                          (a)       Priority of support is to ICD, 2ACII, and
            1AD.

                          (b)       Priority of effort is to counterrftobility,
            survivability, and mobility.

                C. (U) 176 Engr Gp.

                     (1)       Defend and retain BP NIXON from BPI and 2.
            Priority of effort is obstacle zone; AA, AD, and AC, and
            survivability positions in BP2 and BPI.

                     (2)       Block TAPLINE ROAD using earth berms or similar
            techniques. Avoid damaging pavement to the extent that
            substantial  repair would be required, so that it may be
            reestablished as a MSR easily.

                     (3)       Develop counter mobility obstacle system
            astride of Tapline road in designated belts to channelize Iraqi
            units North, and block penetration of BP Nixon.

                     (4)       On order deploy fire fighter detachments to
            LOGBASE ALPHA, priority TPT and ASP locations.

                     (5)       On order, provide IID with tank
            ditch/survivability teams.

                     (6)       On order, transfer control of defense of BP
            Nixon to Bde.





                              3


                                    UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 143 f:/Week-24/BX000213/7TH ENG BDE FRAGOS 001-91 THROUGH 1-91-72/frago 1 91 31 7th eng bde opord 1 91 tth eng bde:08099611155646
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-24
Box ID = BX000213
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = 7TH ENG BDE FRAGOS 001-91 THROUGH 1-91-72
Folder Seq # = 13
Subject = FRAGO 1 91 31 7TH ENG BDE OPORD 1 91 TTH ENG BDE
Document Seq # = 46
Document Date =
Scan Date = 25-JUN-1996
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 09-AUG-1996