          ANNEX L (Construction) to OPLAN 5-90



          1. Situation: No change.

          2. Mission:


          3. (U) Execution


              a. Intent. I want 7th Engr Bdo to provide timely
          sustainment engineering support that satisfies MSC requirements
          within the Corps defined scope of work and priorities. I want to
          conserve TOE equipment to the maximum extent, both during
          production and line haltl, in order to be fully capible of
          supporting Corps follow-on missions.

              b. Concept of operations. MSC requests for engineering
          support pre-approved and prioritized by Corps G3. Project
          directives will be issued to groups and other units under Brigade
          control by FRAGO. Units to whom projects are directed will
          coordinate with customer units to refine scope of work,, and
          coordinate classes of supply to support construction.

              C. Subunit tasks:

                  (1)  7th Engr Bde

                       (a)  Issue construction mission directives

                       (b) Provide command guidance and resolve conflicts

                       (c) Track commercial construction equipment costs
          to Corps

                       (d) Provide primary or aligmc?ntary design, survey,
          and materials support required

                       (e) Process material requests

                  (2)  Assistant Corps Engr

                       (a) Receive MSC construction requests

                       (b) Obtiin GZN7 approval and priority for all
          construction missions


                  (3)  176th Group

                       (a) Supervise project execution

                       (b) Collect and forward required reports

                  (4)  109th Group

                       (a)  SLtPervisc? project execution

                       (b) Collect and -Forward required reports



  L-1
                                 UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 35 f:/Week-36/BX000244/7 ENGINEERING BRIGADE OPORDS - OPLANS/7th eng bde oplan 5 90:09209615581730
Control Fields 17
File Room = sep96_declassified
File Cabinet = Week-36
Box ID = BX000244
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = 7 ENGINEERING BRIGADE OPORDS - OPLANS
Folder Seq # = 1
Subject = 7TH ENG BDE OPLAN 5 90
Document Seq # = 30
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 20-SEP-1996