Document Page: First | Prev | Next | All | Image | This Release | Search

File: 102896_jun96_decls13_0018.txt
Page: 0018
Total Pages: 87

Subject: DAILY COMMANDER SITREP                                          

Box ID: BX000213

Unit: VII CORPS   

Parent Organization: ARCENT      

Folder Title: SITUATION REPORTS  7TH ENG BDE  22 DEC 90- 10 APR 91                                            

Folder SEQ  #:          1

Document Number:          3







        Daily SITREP 7th Engineer Brigade

        221BOOC MAR 91


        TO: VII Corps G-3 (OPS)

        1. Daily Commander SITREP:

             a. Situation- Engineers are now focusing an MSR maintenance
        and destruction of Iraqi equipment and supplies. We are planning
        +or movement back to RAAS. 7th Engineer Brigade has operated
        equipment in theater on an extensive basis since the first week
        in December 1990. There has been no let-up, operations continue.
        Have directed specific maintenance actions in preparation for
        redeployment. Expect OR rate to initially +-all significantly.
        It will improve over time. Brigade is currently maintaining over
        1000 km of MSRs in Corps sector. Assumption of XVIII Airborne
        Corps sector will stress assets but feel we can accomplish
        mission if we receive the 527th Engr En to assist us. Combat
        engineer battalions continue demolition mission, combat heavy
        maintain M8Rs. Divisions should utilize organic engineer assets
        -For work in their sector. We are concerned about lack of Corps
        level logistical support forward of Log Base Nellingen.
        Possibility of movement into the XVIII Airborne Corps sector
        necessitates the need for Corps level logistical support (Class
        I, III and IX) forward in the Corps sector.

             e. Combat Support Equipment Readiness           88
        Lack of Class IX repair parts is adversely,a+fecting the OR rate.
        The M113 fleet is at 76%. The fleet OR will decrease as the
        mechanized engineers are heavily involved in Task Force Demo.
        Running gear, track, road wheels and shock absorbers are a
        spec3.al problem. Coordination with COSCOM (ASCMAT 20 Mar ?I)
        shows no availability throughout the supply system.

             f. Personnel


                   # Pers in               % in                 Pers
                   Theater                 Theater            in FAAs
         5034                    100%               5034

        (NOTE: Does not include approximately       1435 soldiers in theater
        attached to other MSCS.)

             g.  Unit Locations:

                 HHC 7 ENS BDE        PU 750007
                 HHC 176th ENG GP     NS 405925
                 HHC 926th ENG    GP  NS 520590

             h.  Problems Requiring   Corps Assistance:

                 1. Cutting Edges. Present effort by 7th Engr Bde to
        procure  cutting edges +or road graders and dozers involves a
        lengthy  process and produces limited results. Current supply of
        cutting  edges is low. I will continue to attempt to procure

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 87 f:/Week-24/BX000213/SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91/daily commander sitrep:10019616504540
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-24
Box ID = BX000213
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91
Folder Seq # = 1
Subject = DAILY COMMANDER SITREP
Document Seq # = 3
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 01-OCT-1996