Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT
Unit: 1ST ID
Parent Organization: VII CORPS
Box ID: BX001008
Folder Title: DESERT STORM AFTER ACTION REPORTS
Document Number: 4
Folder Seq #: 11
UNCLASSIFIED
C)4/22/91
JULLS LONG REPORT
1. (U) JULLS NUMBER: 41738-692C)4 (C)C)41e), submitted by RILEY
AFZN-F'TM-C, Mr. Walter, 856-2225, (913)239-2225.
2. (U) Operation DESERT SHIELD conducted by USCENTCOM on C)2/11/91.
3. (U) KEYWORDS: EXEC SUM.
4. (U) TITLE- SUMMARY - Phase I - Post Chemical D+-Ficer rL-f
Reserve Component Units
5. (U) NBC Executive Summary regarding Reserve Component Units.
a. PLANNING. Unlike the deployment of Active Component
(AC) Units, no Fort Riley plan existed to mobilize Reserve
Component (RC) Units at less than full mobilization. The
existing Fort Riley Mobilization Plan also contained very little
detail on NBC.
(11 There was neither time nor precedent +or preparing
An NBC operations annex that addressed how to issist mobilized
RC Units in preparing +or war in a chemical environment.
Planning was real-time and driven by FORSCOM directives which
:.;rjeci+ied minimums -For training and logistics.
(2) Under the Fort Riley Mob Plan, Readiness Group Fort
Riley (RGFR) was to become a Mobilization Assistance Team (MAT)
with training and validation functions Linder +LLII mobilization.
RGFR assumed this role Linder the the Desert Shield 200K Call-LIP,
but it was unable to Support the NBC training and validation
mission. Consequently, this responsibility first +ell to the
lst ID NBC Division in AtAg 90, and later shifted to the Fort
Riley DPTM/F'ost Chemical Office (NBC School) in Nov 9C).
(3) Post Chemical assisted RC Units at the Mob Station
with the following tasks; conducting comprehensive NBC
isitions; conducting
individual training; sizing mas@@s and chemical protective
garments; validating individual NBC proficiency; condlkctinq CS
@@iamber exercises, executing bulk draws of CDE and Class Vill
NBC supplies; and receiving Threat Briefings.
b. PREPARATION FOR DEPLOYMENT.
(1) Preparation by many RC Units +or mobilization and
deployment in an NBC environment was minimal.
(a) Most units had insufficient quantities or
unserviceable individual protective equipment, unit detection
equipment, or second chem Suit ensemble. No units had the
helmet cover or NBC bag.
(b) NO units arrived at the Mob Station (MS) with
UNCLASSIFIED
II-31
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996