                                    JULLS LONG REPORT


          task, "Use the Latrine in a Chemical Environment," was
          particularly difficult to train to proficiency.

                       (d) Bull% draw of CDE and Class VIII NBC items
          occurred with little difficulty. The CDE draw assured units
          of having one complete ensemble set and a second BDO. THe first
          was carried by each soldier on board the aircraft, and the
          second in the soldier's duffle bag.

                   (2) In retrospect, the success of NBC preparation for
          deployment may be measured by determining if the events listed
          above reflect positively on the the two FORSCOM directives
          attached as enclosures to this report.

                       (a) In total, the NBC Division, Ist ID (M),
          processed approximately 14 non-divisional units of varying sizes
          (up to company size) that had a total population of 766
          soldiers. NBC Division likewise processed approximately four
          federalized RC Units having a total population of 542 soldiers.
          These actions were completed during the period 8 Aug - 8 Nov C?C).

                       (b) Post Chemical, USAG, processed approximately six
          non-divisional units with a total Population of 212 soldiers,
          and approximately 16 federalized RC units having a total
          Population of 1875 soldiers. This processing took place during
          the period 9 Nov 90 - 16 Jan 91.

                   (3) TrainLtp time -For USAG personnel was sufficient under
          Desert Shield.


               (U) SUBJECT. NONE

               (U) INTEROPERABILITY: NONE


               (U) Lesson distributed by. LOCAL.






















                                       UNCLASSIFIED

                                          II-33

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996