Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT        

Unit: 1ST ID      

Parent Organization: VII  CORPS  

Box  ID: BX001008

Folder Title: DESERT STORM AFTER ACTION REPORTS                                                               

Document Number:          4

Folder Seq  #:         11





                                      UNCLASSIFIED
                                                                        @'14/19/91
                                    JULLS LONG REPORT


          1. (U) JULLS NUMBER, :7.1435-92011 (OC)15@@), Submitted by RILEY
          AFZN-PTM-C, MR WALTERS, e56-2225, (913)239-2225.

          2. (U) Operation DESERT SHIELD conducted bv USCENTCOM on C)2/C)6/91.

          3. (U) KEYWORDS: NBC EQUIPMENT, PLANNING, RWO (REAL WORLD OPS),
          USA (US ARMY), ACTIVE COMPONENT, GUARD COMPONENT, RESERVE
          COMPONENT, ORDERS, READINESS, TRAINING, EQUIPMENT, DOD DIRECTIVES,
          OPLAN (OPERATIONS PLAN), UNFAVORABLE, ACCOUNTABILITY, AVAILABILITY,
          PERFORMANCE, SURVIVABILITY, MATERIEL.

          4. (U) TITLE: LOGISTICS: NBC.- PROTECTIVE          SERVICEABILITY
          CHECK AND FIT

          5. (LJ) OBSERVATION: Not all personnel could be properly fitted
          with A protective mask in time to meet airflow.

          6, (Ul LISCUSSIIIN. Federalized RCU n@isl  serviceability history
          is -Fai- to poor.
                  Common problems included headharnesses which had lost
          their elasticity and dry rotting of the faceblank.
               Insufficient time often e)4isted to requisition replacement
          mas@..-s at Mobilization Station (MS) if needing individuals were
          not already identified at HS (Home Station).. Hence some units
          or individuals could not meet airflow.


          7. (U) LESSCN LEARNED: none

          S. (U) RECOMMENDED ACTION: Mask serviceability checks ar-L- best
          done in advance of movement to MS by skilled 54B MOS personnel
          outside the unit. Tagged L(nserviceables may be brought to MS
          for- disposition.
               Hard-to--fit soldiers should be identified at HS and names
          given to MS prior to arrival along with description of the
          abnc)rmality(ies).
               Create @i protective mask ASL at installation to allow mask
iiin and fill of requisition at Mobilization Station.

          9. (U) COMMENTS:     none



          ---  (U) SUBJECT: LOGISTICS

               (U) INTEROPERABILITY. PLANNING

               (U) Lesson distributed by: FLLP.









                                       UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996