Subject = OPERATIONAL SUMMARY   24 FEB 91 G DAY                           

Parent Organization = CENTCOM     

Unit = ARCENT      

Folder Title = COMMAND REPORT  AFTER ACTION REPORT ENGINEER GE CELL                                            

Document Number =          5

Box ID = BX000525




                                     UNCLASSIFIED
                                         06 MRCH 91/G+10

            I. OPERATIONAL SUMMARY

                A. FRAGOS ISSUE[;: FRAGO 076 DIG 06160OZ, SLJB-T: Destruction of Al
            Disayyah and Qalib Al Luhuays Airfields

                B. TASK oFr.MIZATION: Change to VII Corps Task Organization, See
            Appendix 1 to Annex A

                C. UNIT ATDUVALS: None

            II. LOGISTICAL SUMMARY: LOGSMT EUXN (Paragraphs 4 and 9)

            ENGINEER LOGISTICAL ASSESSMENT: ENGINEER PRWECTS SUPPORTING REDEPLOYMENT
            ARE CRITICAL TO EFFICIET?MY FU)W WM TiflUM THE TRANSITION PROCESS
            RWOMM TO MM MUR APOD OR SPOD DATES. A TarAL OF SIX REDEPLO)ME
            PF40JB= HAVE BEEN IDENTIFIED TO DATE. FT,7E OF THESE PFK@ HAVE BEEN
            IDENTIF'IED FIOR INTENSIVE MNAGEMERR. THESE PPMI= ARE II= IN
            PAPAMAPH 9.F. AND WILL PMUN IN THE LOGSMT FOR THE DURATION OF
            REDEPTO)E@ME. THE CURRENT SLMUS OF EACH PFWBCT AND ANY SPECIFIC REMARKS
            PERTAINING TO A PRWECT WILL BE AMUMM DAILY. OINM REDEPIDYMENT
            PF@QN= WILL BE TRACKED AND INCLUDED IN THE LOGSTAT BY EXCEMON.              w
            4(Ul-i aLAm iv: No CHANGE.
            9(Ulvl ENGINEER DATA:
                r7
                A.  PORT OONSIRUCrION/REHAB: MESSAGE, CCMUSARCENR MAIN, AFRD-EN,
            09110OZ MAR, SUBJ: ENGINEER DAMGE ASSESSMENT OF HARBORS IN KUWAIT,
            TRAN041=. POC MAJ JAA@SM, ARCERR MM--OM, 7952-114.

                B.  AIRFIELD MAINTENANCE AND REPAIR: NO CHANGE.


                C.  THEATER NUN SUPPLY ROUM MAINTENANCE AND REPAIR: NO CHANGE.


                D.  PIPELINE CONSIRUCRICN: NO CHANGE.


                E.  NEW WATER SOURCES: NO CHANGE.


                F.  REDEPLC))U4EW: PARAG@AM ADDED.

                    1)  AR-026, OONSTRWR ASP #4, VIC; EKKC:

                    2)  AR-108, PAVE ROAD (28 KM), VIC; NKMC:

                    3)  AR-201, VUM FACI=ES, VIC; MM/DHAHRAN:

                    4)  AR-202, POIU PAVn4G, VIC; DAMMAN:

                    5)  AR-203, CONSTRUCT ROAD (15 ]KM), VIC; I

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997