Subject = OPERATIONAL SUMMARY   24 FEB 91 G DAY                           

Parent Organization = CENTCOM     

Unit = ARCENT      

Folder Title = COMMAND REPORT  AFTER ACTION REPORT ENGINEER GE CELL                                            

Document Number =          5

Box ID = BX000525








                 H. NARRATIVE: NONE.

                 I. RECEIPT AMURUMED: 416'IH CDR'S SrfREP #82/ENGR S=S RPr #68,
             20TH ENGR BDE ENGR RPr 091845Z MAR. POC MAJ BUSH 7804-233.


             III. SPECIFIC OPERATIONAL ACTIVITIES


                 A.  ARC= ENGINEER


                     1. FDF&DW/MDBILE CP: No entry

                     2. OPERATIONS: See DA 1594


                     3. FACNMESICONSTRUCTION:

                         A) Theater EPW Caqos: Both BRONX and BROOKLYN are 98% complete
             and can handle 48,000 EPWs each. Remaining work to improve waste water
             collection on both sites does riot affect overall capacity.

                         H) Corps EPW CMqD,--: Operating

                         C) Pipeline:

                           1) Phases I through III are cckyplete
                           2) Phase IV: no demand fran LOGBASES; replacement of 15
             miles of flexible pipe on hold.
                           3) Phase V is 193M to LOO@AM ALPHA,. 178KK installed, line
             is operable to PS#7 (96Kt4 mark); 475th is preparing a temporary station.
             Further effort is on hold at this time.

                         D) Patriot Power: DHAHRAN battery is hooked up to commercial
             pmler. UIAMM AB Battery Contractor left the country. 535th EN DEr and
             SUPCCM engineer working; no BM. Transformer being installed at KKIA
             site; revised EM is 10 Mar. Riyadh AB, on fourth site; project complete
             on 28 Feb. Fixed generators. Cmtractors delivered two
             generator/trailers on 2 Mar; remainder on 5 Mar, not on site as of 6 Mar.
             All 12 mobile generators and trailers are now in country.

                         E) ARCEur HQ Power: Transformer installed; ccmercial
             connection completed 4 Mar 91. 416th ENCOM holding on procurement of
             materials for emergency power plan and high rise offices. Cancellation of
             emergency back-up project being addressed. Disposition of 535th EN DEr
             assets undex review.

                         F) ESKAN Army Airfield Power: Ihe work request with guidance
             has been forwarded to 2nd ASH,

                         G) 86th Signal BN Power: Plan for commercial power connection
             has been forwarded to ARCERR G3.

                         H) Class IV (Barrier):

                            1) Disposition of Class IV: Significant quantities of
             Class IV, both barrier and construction, are being identified at or
             enroute to theater storage. Disposition plans will be developed as total
             quantities are identified and operational project requirements are
             developed.
                                              G+10 PG 2

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997