Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Parent Organization = CENTCOM
Unit = ARCENT
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Document Number = 5
Box ID = BX000525
PRaTEr-T TIM LOC P114AM
AR-200 Const Tech Ctrl Fac UWUW Awaiting Design
AR-201 Redeplyyftt Wash Facs MC/ Being Design
DHAHRAN
AR-202* Redeplymt Pc)rt Paving DMW Being FWd to CRUOCM
AR-203* Construct 15 EN Road EKMC Being M to CRUCC14
* Two additional redeployment pro3ects approved by the HQ, ARCERR PRB on 6
Mar 91.
K) MSR Status:
West Range Road - Amber, 43 EN BN's is now EM 15 Mar
Fast Range Road - Red, has been deferred.
SE Dodge - QMM, shoulder Work revised ]DM is 24 Feb due to
rain delay/dainage.
NW Dodge Green, cold patch work casing minimal traffic
disruption.
Sultan(Nash) Green
NW old Tapline Green
SE Old Taplim Qmm
XVIII ABN Corios MSRs to LOGBASES ROMM and OSCAR
Georgia - Green 6lanes; due to rain
Montana - Green 6lanes good to border
Texas - Green 2lanes; due to rain
Ohio - Green - 2lanes good along border
Virginia - Green - 2lanes gravel
Colorado - Green 2lanes gravel
VII Corps KEY MSRs
Green and Blue - Green 2lanes
Black - Green 2lanes gravel
B. FAC/416TH ENOC14: Engineer Status Report #66 07093OZ MAR 91 and
Cmmkmider's SITREP #80 07093OZ MAR 91.
A) CUFDUM OPERATIONS: Range Road is Amber. 43D EN BN continues
to repair a sub-base failure; BM is 15 MAR to initial standards. All of
MSR Dodge is Green. MSR Sultan is Green. All other roads still green.
SWAPDOP - Pipeline project: Phase V 85% The project is on hold. 179KM
of rigid pipe has been installed. Quartermaster has directed that no
additional pipe be transported to complete this segment. The line has
been successfully tested to pump station #7. The quartrxmaster will
operate a teml=ary fuel dispensing station at Rmp Station #7. EPW
CU4MNDS: Western site: #2 85% Engineer effort on site is complete.
There are 22 towers, 320 latrines, and 135 showers on site. Digging sumps
and improving roads continues. 'Ihe sanitary lagoon is complete.
Additional regiirmerrts for EPW processing are underway. #2A 80% 100% of
CaM is bermed. The sanitary lagoon is complete. Additional requirements
for EPW processing are underway.
B) ENGINEER ISSUES: N/A
G+10 PG 4
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997