Subject = OPERATIONAL SUMMARY   24 FEB 91 G DAY                           

Parent Organization = CENTCOM     

Unit = ARCENT      

Folder Title = COMMAND REPORT  AFTER ACTION REPORT ENGINEER GE CELL                                            

Document Number =          5

Box ID = BX000525







                            3. Theater MSRS. Dravp- I-M McDonald; it is not well signed
             at point where McDonald meets @M Pyle. Cannot follow route through
             JAHR. How far off the MSR is McDonald cleared.
   0                     C)  PRIORITY OF WOW: Not reported

                         D)  PRIORITY OF MM: Not reported

                         E)  TOPOGRAPHIC SUPPORT: Not reported

                         F)  PROPOSED OPERATIONS:

                             1. Engineers assigned to 2ACR, 1AD and 3AD are supporting
             umt mobility and providing division supply routes. Divisions responsible
             for denial in sector. BDE has Corps rear (EWL is ISPA Road and 1 (UK) AD
             Rear Bmxlary). BDE will construct two additional MSR from ISPA Road
             forward to divisions.
                             2. Engineers will be prepared to support the defense and
             restoration of Kuwait and redeployrmt of forces. See a continued need
             for groups and cmibat heavies for a period of time to do scm specific
             tasks. E@cwWles include: repair and maintenance of Ali Alsalem Airfield,
             support to units in Kuwaiti Defense, maintenance of MSRs as we redeploy
             XVIII ABN Corps and remove friendly and enemy equipment in Iraq, and
             constniction to support living areas/training areas in VII Corps staging
             Areas. Exact tasks, duration of need for groups and heavy units will be
             identif ied through a detailed planning process.
                             3. Corps Engineer should riot be tasked to do any large
             eqlupwmt intensive tasks. Focus should be on maintenance of equipment
             for turn-in or redeployment. Most tasks around living area or former unit
             location should be done by contract or EAC unit. 7 EN BDE units carried
             the brunt of establishing the Corps in sector. niey, a- well as division
             units, cannot be expected to provide the same level of effort during
             redeployment. Start now to identify and redistribute XVIII ABN Corps
             leased construction equipment. VII Corps can use blade and haul assets
             ASAP.
                             4. Some concern about the availability of EAC Engineer
             Units to assist in defense of Kuwait, redeployment and the residual
             force. It appears all EALC units depart by Phase II. Are other units due
             in? If, not the Corps will have to establish RAAS and then support its
             redeployment. There are significant engineer tasks in these activities.
             A redeploying Corps will not have the assets to accomplish them.

                     2. XVIII ABN CORPS/20TH ENGR BDE: Report not received















                                             G+10 PG 6

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997