Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Parent Organization = CENTCOM
Unit = ARCENT
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Document Number = 5
Box ID = BX000525
3. Theater MSRS. Dravp- I-M McDonald; it is not well signed
at point where McDonald meets @M Pyle. Cannot follow route through
JAHR. How far off the MSR is McDonald cleared.
0 C) PRIORITY OF WOW: Not reported
D) PRIORITY OF MM: Not reported
E) TOPOGRAPHIC SUPPORT: Not reported
F) PROPOSED OPERATIONS:
1. Engineers assigned to 2ACR, 1AD and 3AD are supporting
umt mobility and providing division supply routes. Divisions responsible
for denial in sector. BDE has Corps rear (EWL is ISPA Road and 1 (UK) AD
Rear Bmxlary). BDE will construct two additional MSR from ISPA Road
forward to divisions.
2. Engineers will be prepared to support the defense and
restoration of Kuwait and redeployrmt of forces. See a continued need
for groups and cmibat heavies for a period of time to do scm specific
tasks. E@cwWles include: repair and maintenance of Ali Alsalem Airfield,
support to units in Kuwaiti Defense, maintenance of MSRs as we redeploy
XVIII ABN Corps and remove friendly and enemy equipment in Iraq, and
constniction to support living areas/training areas in VII Corps staging
Areas. Exact tasks, duration of need for groups and heavy units will be
identif ied through a detailed planning process.
3. Corps Engineer should riot be tasked to do any large
eqlupwmt intensive tasks. Focus should be on maintenance of equipment
for turn-in or redeployment. Most tasks around living area or former unit
location should be done by contract or EAC unit. 7 EN BDE units carried
the brunt of establishing the Corps in sector. niey, a- well as division
units, cannot be expected to provide the same level of effort during
redeployment. Start now to identify and redistribute XVIII ABN Corps
leased construction equipment. VII Corps can use blade and haul assets
ASAP.
4. Some concern about the availability of EAC Engineer
Units to assist in defense of Kuwait, redeployment and the residual
force. It appears all EALC units depart by Phase II. Are other units due
in? If, not the Corps will have to establish RAAS and then support its
redeployment. There are significant engineer tasks in these activities.
A redeploying Corps will not have the assets to accomplish them.
2. XVIII ABN CORPS/20TH ENGR BDE: Report not received
G+10 PG 6
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997