Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Parent Organization = CENTCOM
Unit = ARCENT
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Document Number = 5
Box ID = BX000525
3) Pickets: 127,000 each, various sizes, available at
LOGBASE BRAVO; 28,000 each, various sizes, are at 321st @M.
4) Sandbags: 1,283,000(+) at 32lSt NM arid 3,900,000(+) at
IOGWE BRAVO. 5) Saudi-,controlled Class IV at IQW: BG Schardein to meet
with LTC Assaf.
I) Class IV (Construction):
1) Gravel: Gravel is available for pick-up from quarry vic
NS4062. 155th EN Co (CS) is on site as augmentation.
2) Dust Palliative: 843 barrels (44,679 gallons) available
at LOGBASE BRAVO. Contract for delivery of 9000 barrels (477,000 gallons)
awarded. 1874 of 2000 barrels delivered as of 27 Feb to Ash-,9hubah and
1851 to LOG3ASE BRAVO. Remahlirig 5000 barrels on hold, but available if
needed. CENTCCt4 RCCH POC is CPr Alexander.
3) Crude Oil: Al--Qaysumh source point repaired. VII
Corps and XVIII AEN Corps have been notified. Bath O=ps indicate
continuing need for crude oil. 364K gallon remains on order; expect 80K
to left 3 Mar for XVIII AEN Corps, 24K leaving 4 Mar for XVIII AEN Corps,
none on 5 Mar, 32K on 6 Mar, 24K on 7 Mar. None projected to depart on 8
Mar.
4) Airfield mttincj: Guidance for the recovery and turn in
of matting being disseminated in the ARcENr LoGsTAT. mg matting is
rlon-experidable and will be turned into the 165th Supply Cc) (HVY MIL) at
IQOE for further processing.
5) Harzard Marking Tape: Red/white diagonal plastic tape
available at IOM. Rough allocation is 500 for VII Corps, 300 for XVIII
ABN Corps, and 200 for theater reserve.
6) Barbed Wire: RCC14 promwing 20,000 spools through Host
Nation; final delivery on 5 Mar. 2600 rolls currently on the ground.
31,000 of 45,000 each 1.7m rebar pickets delivered to KiM. Remainder to
be delivered 5 March; not confirmed.
J) Contract Status: Following is the total listing of
unawarded projects:
PRaTECr Ti= IDC REMAIW
AR-006 Billeting Czvpound ERW Need SUPOOM Justification
AR-017 Billeting Cmpmnd DHAHRAN Need SUPOOM Justification
AR-026 Construct ASP f4 KKKC Need SUPOO[4 Justification
AR-097E Medical Storage DHAHRAN Prefabricated Structure
AR-108 Pave Road (28KK) lqw Need SUPCCM Justification
AR-109 Security Fence TASP1 DFMHRAN Pmxhng Contract
AR-127 Renovate C3 Fac Riyadh Pending Contract
AR-149A = Concrete Var L.Oc NIA
AR-163 Upgrade Patriot Site Riyadh Pending Contract
AR-171 Refuel Point lqw Awaiting Materials
AR-193 Showers & latrines Var Loc Being returned w/o action
AR-198 Hazardous waste kwl KsA Pending DCINC Approval
AR-199 Hazardous waste ranvl AoR Pending DCINC Approval
AR-200 Const Tech Ctrl Fac UgUiPM Awaiting Design
G+ll PG 3
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997