Subject = OPERATIONAL SUMMARY   24 FEB 91 G DAY                           

Parent Organization = CENTCOM     

Unit = ARCENT      

Folder Title = COMMAND REPORT  AFTER ACTION REPORT ENGINEER GE CELL                                            

Document Number =          5

Box ID = BX000525







                              3) Pickets: 127,000 each, various sizes, available at
               LOGBASE BRAVO; 28,000 each, various sizes, are at 321st @M.
                              4) Sandbags: 1,283,000(+) at 32lSt NM arid 3,900,000(+) at
               IOGWE BRAVO.   5) Saudi-,controlled Class IV at IQW: BG Schardein to meet
               with LTC Assaf.

                           I) Class IV (Construction):

                              1) Gravel: Gravel is available for pick-up from quarry vic
               NS4062. 155th EN Co (CS) is on site as augmentation.
                              2) Dust Palliative: 843 barrels (44,679 gallons) available
               at LOGBASE BRAVO. Contract for delivery of 9000 barrels (477,000 gallons)
               awarded. 1874 of 2000 barrels delivered as of 27 Feb to Ash-,9hubah and
               1851 to LOG3ASE BRAVO.    Remahlirig 5000 barrels on hold, but available if
               needed. CENTCCt4 RCCH POC is CPr Alexander.
                              3) Crude Oil: Al--Qaysumh source point repaired. VII
               Corps and XVIII AEN Corps have been notified. Bath O=ps indicate
               continuing need for crude oil. 364K gallon remains on order; expect 80K
               to left 3 Mar for XVIII AEN Corps, 24K leaving 4 Mar for XVIII AEN Corps,
               none on 5 Mar, 32K on 6 Mar, 24K on 7 Mar. None projected to depart on 8
               Mar.
                              4) Airfield mttincj: Guidance for the recovery and turn in
               of matting being disseminated in the ARcENr LoGsTAT. mg matting is
               rlon-experidable and will be turned into the 165th Supply Cc) (HVY MIL) at
               IQOE for further processing.
                              5) Harzard Marking Tape: Red/white diagonal plastic tape
               available at IOM. Rough allocation is 500 for VII Corps, 300 for XVIII
               ABN Corps, and 200 for theater reserve.
                              6) Barbed Wire: RCC14 promwing 20,000 spools through Host
               Nation; final delivery on 5 Mar. 2600 rolls currently on the ground.
               31,000 of 45,000 each 1.7m rebar pickets delivered to KiM. Remainder to
               be delivered 5 March; not confirmed.

                           J) Contract Status: Following   is the total listing of
               unawarded projects:

               PRaTECr       Ti=                  IDC      REMAIW

               AR-006      Billeting Czvpound     ERW      Need SUPOOM Justification
               AR-017      Billeting Cmpmnd       DHAHRAN  Need SUPOOM Justification
               AR-026      Construct ASP f4       KKKC     Need SUPOO[4 Justification
               AR-097E     Medical Storage        DHAHRAN  Prefabricated Structure
               AR-108      Pave Road (28KK)       lqw      Need SUPCCM Justification
               AR-109      Security Fence TASP1   DFMHRAN  Pmxhng Contract
               AR-127      Renovate C3 Fac        Riyadh   Pending Contract
               AR-149A     = Concrete             Var L.Oc NIA
               AR-163      Upgrade Patriot Site   Riyadh   Pending Contract
               AR-171      Refuel Point           lqw      Awaiting Materials
               AR-193      Showers & latrines     Var Loc  Being returned w/o action
               AR-198      Hazardous waste kwl    KsA      Pending DCINC Approval
               AR-199      Hazardous waste ranvl  AoR      Pending DCINC Approval
               AR-200      Const Tech Ctrl Fac    UgUiPM   Awaiting Design




                                                G+ll PG 3

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 99 f:/Week-33/BX000525/COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL/operational summary 24 feb 91 g day:04189716374911
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000525
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMAND REPORT AFTER ACTION REPORT ENGINEER GE CELL
Folder Seq # = 9
Subject = OPERATIONAL SUMMARY 24 FEB 91 G DAY
Doc Seq # = 5
Doc Date =
Scan Date =
Queued for Declassification = 25-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-APR-1997