Document Page: First | Prev | Next | All | Image | This Release | Search

File: 970513_aug96_sagwi1_0109.txt
Page: 0109
Total Pages: 273

Subject = PREFACE THE FINAL CHAPTER CLOSEOUT AAR                          

Parent Organization = CENTCOM     

Unit = ARCENT      

Folder Title = 22D  SUPCOM  AAR  VOLUME    13     OF  XVI                                                      

Document Number =          2

Box ID = BX000512



                                                         A b



             THF-AT-ER AMKUNITIOI( OFIFIR,ER

                   0  Determine six of Class V currently in Kuwait, balance
             against TVR requirammt and ammunition na*d*d to sustain
             rotational exercise unit training.
                   0 Conduct assess"nt of existing ASP facilities in
             Kuwait and prepare recommendation an best storage options.

                   • Prepare cost estimate on construction of new ASP to
             house class V in storage igloos. '

                   • Conduct safety inspection of TF Victory II Cl.V
             operation and recommend imprcvmmnts as appropriate.

             2ASG

                   0 identify )M available and prepare to send an ME
             platoon 'to Doha by 12 SEP 91. Plan for 50t warehouse
             forklifts.

                   0 Assist CESSWA with personnel and equipment
             augmentation as required.

                   0 Plan and execute closeout procedures to accompany
             drawdown of strarxjth at KKKC.

                   0 Alert 2ASB to assume mission of PASCO in Doha upon
             completion of XKMC cloz*out, and integrate the PASCO
             operation into 2ASB*s op4ration.



                   • coordinate propositioned CI.V requirement with TAO.

                   • Identify and prepare for shipment that Cl.V required
             in Kuwait.

                   o Prepare to assist retrograde of USAF Cl.V as
             necessary.
                   a Ensure that prop4tr'handling procedures and safety are
             followed throughout retrograde.

                   0 . Plan and execute retrograde of cl.V from TSA4 and
             TSAS.



             CEGSWA

                   0 Prepare to execute more of equip=ant and personnel to
             Doha as focus shifts from KKMC to Doha.

                   0 coordinate Doha space utilization with FASCO to
             ensure best usage with minimal disruption.

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 273 f:/Week-32/BX000512/22D SUPCOM AAR VOLUME 13 OF XVI/preface the final chapter closeout aar:0507971526512
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-32
Box ID = BX000512
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = 22D SUPCOM AAR VOLUME 13 OF XVI
Folder Seq # = 15
Subject = PREFACE THE FINAL CHAPTER CLOSEOUT AAR
Doc Seq # = 2
Doc Date =
Scan Date = 20-AUG-1996
Queued for Declassification = 22-AUG-1996
SAGWI Request = 10-APR-1997
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 07-MAY-1997