Document Page: First | Prev | Next | All | Image | This Release | Search
File: 980404_jul96_sagwi1_0028.txt
Subject = CHANGE 3 TO XVIII ABN CORPS FIELD SOP 7 JAN 91
Box ID = BX000436
Folder Title = DAILY JOURNAL ARCENT 27 JAN 91
Unit = ARCENT
Parent Org = CENTCOM
JAN iggi
TAB H (ENGINEER SITUATION REPORT) TO APPENDIX 3 (OPERATIONS
REPORTS) TO ANNEX X (REPORTS) TO XVIII AIRBORNE CORPS FIELD SOP
1. Purpose. This report provides a daily summary of existing
conditions pertinent to the.engineer situation. It is submitted
to the XVIII Airborne Corps Engineer Section by all MSCs with
engineer units assigned or attached. The report is due at 1700
hours as of 1500 hours local.
Precedence/Classification
Line 1. ENSITREP/DTG
Line 2. UNIT
Line 3. GRID LOCATION
Line 4. PERIOD OF REPORT (DTG)
Line 5. SUBORDINATE ENGINEER UNIT LOCATIONS
a. UNIT
b. LOCATION
Line 6. MISSION STATUS:
(.1) MSN
(2) LOCATION - grid location
(3) TYPE mobility, countermobility, survivability,
sustainment
(4) START date started
(5) COMP percentage complete rounded to nearest
whole number
(6) EST COMP - estimated completion date based on
engineer assessment of work still to be accomplished.
(7) REMARKS
Line 7. TACTICAL/ASSAULT BRIDGE
(1) UNIT
(2) TYPE - type bridging (including rafts)
X-3-H-1
Document Page: First | Prev | Next | All | Image | This Release | Search