                                   JULLS LONG REPORT


          1. (U) JULLS NUMBER: 41555-45162 (00409), submitted by RILEY
          AFZN-ST, LTC Johnson, 856-5715, (913)2@@9-5715.

          2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 02/11/91.

          @'. (U) KEYWORDS: PLANNING, ORDERS/GUIDANCE, RWO (REAL WORLD OPS),
          JDA (JT DEPLOYMENT AGNCY), USA (US ARMY), ACTIVE COMPONENT, GUARD
          COMPONENT, RESERVE COMPONENT, C2 (COMMAND AND CONTROL), COMMAND
          RELATIONSHIF-S, LIAISON, PLANS, DEPLOYMENT, STRATEGIC SEALIFT,
          TRANSPORTATION, SEALIFT, UNFAVORABLE, COORDINATION, PRIORITY, CRIT2
          (SERIOUS F'ROBLEM).


          4. (U) TITLE: DEPLOYMENT4 SEALIFT: Unit Equip Split into ML(IT
          Increments at SPOE


          5. (LI) OBSERVATION, Unit equipment frequently is split into
          multiple increments at the SF'OE.

          6. (LI) DISCUSSION:  The capabilty of deployed units to move
          from the sea prt of debarkation (SF,OD) into their tactical
          assembly areas (TAA) is dependent upon the arrival times of the
          ships which are carring their equipment. Deploying units have
          no input to MSC regarding what equipment is loaded onto which
          ship. MSC's objective is to maximize the use of space on ships
          without apparent regard to the resultant effects Such loadina
          will have on units' operational capability.

          7. (LI) LESSON LEARNED, Congestion at the SPOD is compounded by
          the need +or units to wait for the arrival of their equipment on
          multiple ships.

          S. (LI) RECOMMENDED ACTION: FORSCOM: Renegotiate procedures to
          allow deploying unit to influence what is loaded even if ships
          are not filled to the maximum.


          9. (LI) COMMENTS:   none


              (U) SUBJECT: DEPLOYMENT


INTEROPERABILITY: JTTP


              (U) Lesson distributed by: FLLP.














                                     UNCLASSIFIED


                                       TV-' -/ 7

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996