04/19/91
JULLS LONG REPORT
1. (U) JULLS NUMBER: 30737-94275 (00096), submitted by RILEY
AFZN-JA, CPT NEPPER, 856-3675, (913)239-3675.
2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 03/01/91.
3. (U) KEYWORDS: HAZARDOUS WASTE DISPOSAL, ENVIRONMENTAL LAW,
PLANNING, RWO (REAL WORLD OPS), USA (US ARMY), ACTIVE COMPONENT,
LEGAL, LOGISTICS, PRIORITY, CRIT3 (IMPORTANT PROBLEM).
4. (U) TITLE: LOGISTICS: HAZARDOUS WASTE DISPOSAL AND
ENVIRONMENTAL LAW
5. (U) OBSERVATION: DEH environmental personnel established an
..amnesty point" for turn in of hazardous wastes (HW) and
materials (HM). They were quickly overrun with turn ins, which
created the potential +or violation of environmental
regulations. DEH personnel continue to work overtime to
process HWs and HMs collected at the amnesty point.
6. (U) DISCUSSION: Environmental personnel strongly suspected
that units were holding onto HW and HM instead of turning them
in. Complex environmental requirements for identifying and
processing HW complicated this problem. Example: Units turned
in 60-gallon drums that contain a mixture of HWs. An analysis
is required to determine the contents before a disposal method
is determined.
7. (U) LESSON LEARNED: Units will accumulate enormous
quantities of HW and HM unless regular turn in to "amnesty
points" becomes a matter of command emphasis.
e. (U) RECOMMENDED ACTION: Prepare for more HWs and HMs to be
turned in than one could believe possible. Aggressively pursue
tlirn-in before deployment to get units to regularly turn in HWs
d HMs instead of hoarding them. Closely monitor state and
federally mandated transfers to ensure HWs and HMs are
manifested for disposal properly and promptly.
9. ('P) COMMENTS:
--- (U) SUBJECT: LOGISTICS
(U) INTEROPERABILITY: PLANNING
(U) Lesson distributed by: FLLP.
UNCLASSIFIED
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996