Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT
Unit: 1ST ID
Parent Organization: VII CORPS
Box ID: BX001008
Folder Title: DESERT STORM AFTER ACTION REPORTS
Document Number: 4
Folder Seq #: 11
UNCLASSIFIED
04/19/91
JULLS LONG REPORT
1. (U) JULLS NUMBER: 30829-63428 (00099), submitted by RILEY
AMXLA-C-C, LTC GRIFFIN, 856-4241, (913)239-4241.
2. (U) Operation DESERT SHIELD conducted by USCENTCOM on @)2/11/91.
3. (U) KEYWORDS: RWO (REAL WORLD OPS), USA (US ARMY), ACTIVE
COMF,ONENT, LOGISTICS, MAINTENANCE, FAVORABLE, SUPPORTABILITY,
INTEROPERABILITY, PLANNING.
4. (U) TITLE-. LOGISTICS: LOGISTIC ASSISTANCE F'ROVIDED TO
DEF'LOYING AC AND RC UNITS
5. (U) OBSERVATION: Providing overall logistics support for
unit readiness and deployment.
6. (U) DISCUSSION- a. During the preparation phase of the Ist
ID for deployment to SWA, the Logistic Assistance Office (LAO)
provided assistance toward LtpgrEtding all equipment to +Lilly
mission capable (FMC). Logistic Assistance Representatives
(LAR5) physically visited units to assist in hands-on repairs of
deadlined equipment. The LARs also initiated actions to
e,@pedite delivery of repair parts required to upgrade the
deadlined equipment. Because of the tremendous workload
required to upgrade the equipment to Cl condition, the LAO
recommended that various depot assistance teams be sent to Fort
Riley to provide assistance in repairing the items a+ equipment.
b. The +allowing teams were sent to Fort Riley to assist
the Ist ID and Reserve Component units with deployment
preparations:
(1) Ml, M2/M3 team which consisted of a F'roject Manager and
contract support personnel from FMC, Penistar, and GE. They
were instrumental in removing 50 Mls from deadline StEltLIS,
(2) Red River Army Depot sent a team to repair M981s,
s, and MLRS.
(3) Anniston Army Depot furnished a team +or TOW 2 support.
(4) Letterkenny Army Depot furnished a team +or M109A2.
(5) MICOM furnished a team +or TOW modifications.
(6) Rock Island Arsenal sent a LAR to assist local LARS.
(7) A S@ipply Logistic Management Specialist (LMS) was sent
from Fort Hood.
C. It should also be noted that while the Division and
Reserve units ere preparing -For deployment to SWA, there were
additional requirements placed on the LAO +or new equipment to
be fielded. This equipment would eventually be included in the
deployment package. The equipment fielded included:
M9:7.9 series trucks, 592 ea;
HMMWVS, 530 ea:
HEMMTS, IC)O Plus;
UNCLASSIFIED
@ 3 -7
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996