Document Page: First | Prev | Next | All | Image | This Release | Search
File: 123096_jul96_decls1_0132.txt
Subject: SPECIAL INFORMATION FOR INSTALLATION AFTER ACTION REPORT
Unit: 1ST ID
Parent Organization: VII CORPS
Box ID: BX001008
Folder Title: DESERT STORM AFTER ACTION REPORTS
Document Number: 4
Folder Seq #: 11
UNCLASSIFIED
04/19/91
JULLS LONG REPORT
1. (U) JULLS NUMBER: 31338-18596 (00129), Submitted by RILEY
AFZN-DL-S, N. WALKER, 856-338B, (913)239-3389.
2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 02/(-)7/91.
3. (U) KEYWORDS: RWO (REAL WORLD OPS), USA (US ARMY), ACTIVE
COMPONENT, GUARD COMPONENT, RESERVE COMPONENT, LOGISTICS.
EQUIPMENT, SUPPLY, TRANSPORTATION, ACCOUNTABILITY, CRIT3 (IMPORTANT
PROBLEM), PLANNING.
4. (U) TITLE: LOGISTICS: CONTROL AND ACCOUNTABILITY OF UNIT
SHIPPING CONTAINERS
5. (U) OBSERVATION: There was no serial number tracking system
established to keep track of commercial containers as they were
processed through the warehouse.
6, (Ul DISCUSSION, The first containers were ordered on 11 Nov
90. The delivery order was sent to G-3, the receiving reports
went to Transportation Division and SLtpply/Services Division was
asked to submit a receiving report by serial number on 19 Nov
9o. By this time, SLtpply/Services Division had received
approximately 257 commercial containers and 132 chassis.
Transportation Division had to go through their files to pull up
the serial numbers +or those commercial containers received up
to that point. Starting 19 Nov 90 the wareholtrse started
sending receiving reports to Supply/Servic@s Division +or
containers and chassis. This delay in tracking caused quite a
problem determining what had been received. On 26 Nov 9C)
SLipply/Services Division found out who was issuing them to
Division units enabling supply clerks to check quantities
received. The Division property book officer was also trying to
track down the serial numbers and determine which unit had
received coi-itainers/chassis.
7. (U) LESSON LEARNED: Control be centralized in Operation
Branch of SLtpply/Servic:es Division, DOL. Installation Central
Receiving Point make a log by serial number. Ali paperwork
pertaining to shipments go to one designated place/individLtal.
That individual Would then furnish information to those who
needed to know(e.g. G-3, DOC, Transportation, SLtpply/Services
Division, etc.)
8. (LJ) RECOMMENDED ACTION- DOL: Implement control Measures.
9. (U) COMMENTS: none
--- (U) SUBJECT: LOGISTICS
(U) INTEROPERABILITY: PLANNING
UNCLASSIFIED
@, -L//
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996