                                      UNCLASSIFIED
                                                                      04/19/91
                                    OULLS LONG REPORT

           1. (U) JULLS NUMBER: 31449-21505 (00168), submitted by RILEY
           AFZN-PTM-C, MR WALTER, 856-2225, (913)239-2225.

           2. (U) Operation DESERT SHIELD conducted by USCENTCOM on 02/06/91.

           3. (U) KEYWORDS: RWO (REAL WORLD OPS), USA (US ARMY), ACTIVE
           COMPONENT, GUARD COMPONENT, RESERVE COMPONENT, C2 (COMMAND AND
           CONTROL), ORDERS, READINESS, UNFAVORABLE, CAPABILITY, SUITABILITY,
           MATERIEL, TRAINING.

           4. (U) TITLE: LOGISTICS: NBC: SIZING CRITERIA

           5. (U) OBSERVATION: Different sizing criteria for BDO verses CPO
           required all Ist ID (M) and RC soldiers to be sized.

           6. (U) DISCUSSION: All units used CPOs for training. They drew
           BDOs -For contingency. However, the BDOs were larger than the
           Cpos. Therefore all personnel in lst ID (M) and RC units were
           given the opportunity to be sized.
               Gloves were issued in any of +our sizes.
               Black chemical overboots soon were no longer in the
           inventory. Hence units had to size using the GVO substitute or
           extract clothing record data.

           7. (U) LESSON LEARNED: none

           e. (U) RECOMMENDED ACTION: Sizing for wet weather gear should
           consider its wear over the ensemble.
               Sizing a-F personnel is best done by the unit. Battalions
           may be scheduled for a sizing set for +it in advance Of draw.
               Sizing done during this phase allowed time for rotation of
           sets among units be4ore bulk draw occurred.

           9. (U) COMMENTS:    none



           --- (U) SUBJECT: LOGISTICS


               (U) INTEROPERABILITY: MATERIEL


               (U) Lesson distributed by: FLLP.















                                      UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 517 f:/Week-26/BX001008/DESERT STORM AFTER ACTION REPORTS/special information for installation after actio:12179611150511
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-26
Box ID = BX001008
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = DESERT STORM AFTER ACTION REPORTS
Folder Seq # = 11
Subject = SPECIAL INFORMATION FOR INSTALLATION AFTER ACTIO
Document Seq # = 4
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996