                 (9)    (U) Provide bulk POL support to aligned supported
         units in AA using tanker and ROM asi;ets'.

                 (10)       Sample aII4 captured fuel stocks
         immediately and send samples to POL lab at LOGBASE CHARLIE. Report
         results immediately to CMMC/MMr. Provide I each - all level/
         Top/Middle/Bottom - sample of each bulk storage tank.
                                              I
                 (11) (U) Provide unit distribution of bulk fuel to
         all hospitals.

                 (12) (U) Do not install POL assault hose line in
         areas that could possibly limit maneuvers. Coordinate
         through S/G-3 channels prior to installing assault hose line.

                 (13) (U) All bulk fuel supply poin   'ta must have
         heliport capable of filling 500 gallon collapsible drums and
         performing sling load operations. Notify DCO LOG OPS when aerial
         resupply capability is operational.

              . (14) (U) Be prepared to perform aviation refueling
         mission.

                 (15) (U) Be prepared to perform refuel on the move
         (ROM) missions.


                 (16) (U) Ensure all 500 gallon drums are marked
         with product they contain. Must prevent contamination.

                 (17) (U) Keep all 500 gallon drums topped off.
                 (18)  A) NLT Phase 11, D+2 top off   all POL vehicles
         and maintain POL vehicles full. Define requirements through daily
         REPOL.


                 (19) (U) Establish TPU(S) refuel site other than at
         POL supply companies. POL supply companies should be used by POL
         vehicles with a carrying capacity greater than 2.000 gallons.

                 (20) (U) Establish retail fuel operations within
         each logbage Logistics Release Point (LEP) within two hours upon


                 (21) (U) Manifold the maximum amount of pumps.
nto bulk fuel systems to maximize
         amount of POL vehicles unload and load points.

                 (22) (U) Only down load required equipment to
         support defined missions. Be prepared to relocate to meet the fuel
         requirements of the xvzir ABN Copps with minimum advance notice.

                 (23) (U) While in Saudi Arabia and where available


                                    UNCLASSIFIED
                                       D-2-P-

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 117 f:/Week-15/BX000040/OPERATIONS PLANNING FILES JAN-MAY 91 1 OF 2/1st coscom operation order desert storm:12269616083622
Control Fields 17
File Room = apr96_declassified
File Cabinet = Week-15
Box ID = BX000040
Unit = XVIII CORPS
Parent Organization = ARCENT
Folder Title = OPERATIONS PLANNING FILES JAN-MAY 91 1 OF 2
Folder Seq # = 60
Subject = 1ST COSCOM OPERATION ORDER DESERT STORM
Document Seq # = 5
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 26-DEC-1996