Document Page: First | Prev | Next | All | Image | This Release | Search

File: 970101_apr96_decls10_0071.txt
Page: 0071
Total Pages: 117

Subject: 1ST COSCOM OPERATION ORDER DESERT STORM                         

Unit: XVIII CORPS 

Parent Organization: ARCENT      

Box  ID: BX000040

Folder Title: OPERATIONS PLANNING FILES  JAN-MAY 91  1 OF 2                                                   

Document Number:          5

Folder Seq  #:         60





                                      rLc


                        (a)(AProvide retail fuel support on Tapline Road in
         AO PEAR. Ensure traffic can clear the road.

                        (b)  WT As required by 101st AASLT and throughout
         phase rri install and operate a 24 point aviation rapid refuel
         point (RRP) at vicinity AO Pear.
                        (c)  X    Use organic @anker assets to fill and
         maintain stockage levels at the RRP. Be prepared to receive EAC
         POL tankers (military and host nation) to discharge into the RRP.
                        (d)(4 Be prepared to interface the RRP and tactical
         petroleum terminal with assault hoseline. Coordinate with 507th
         CSG and EAC for assault hose line installation.
                        (e);4Provide POL tanker support (unit distribution)
         to the 6th French Div. Direct coordination is authorized to
         determine requirements and equipment comparability.
                 2.CU)Phase III:
                      a.e)Provide bulk fuel support (unit distribution) to
         the 101st AASLT and 12th AVN BDE and accompanying nondivisional
         units.

                      bieprovide POL tanker support (unit distribution) to
         the 6th French Div.
             d.(U)171.gt CSC;:

                 I.(u@Phase 11:
                      (a)/AProvide retail fuel support on Tapline Road in AO
         TEAK. Ensure traffic can clear the road.

                      (b)@operate a fuel transfer point for down loading of
         both civilian and military POL tankers to support the local area of
         operation until EAC TPT at LOGBASE CHARLIE is established.
                      (c @ On-order receive OPCON the 1450th POL TAX Co until
         Phase III R+40 from the 507th CSO. Expect OPCON 96 hours prior to
         G-Day.
                      (D)VNLT Phase II D+4 install and operate a POL mobile
         lab at LOGBASE CHARLIE. Coordinate location and life support with
 CSO.
                 2. @hase III:
                      (a)AProvide bulk fuel support (unit distribution) to
         the 24th Infantry Division (M) and accompanying nondiviaional
         units.



                                        D-2-,+

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 117 f:/Week-15/BX000040/OPERATIONS PLANNING FILES JAN-MAY 91 1 OF 2/1st coscom operation order desert storm:12269616083622
Control Fields 17
File Room = apr96_declassified
File Cabinet = Week-15
Box ID = BX000040
Unit = XVIII CORPS
Parent Organization = ARCENT
Folder Title = OPERATIONS PLANNING FILES JAN-MAY 91 1 OF 2
Folder Seq # = 60
Subject = 1ST COSCOM OPERATION ORDER DESERT STORM
Document Seq # = 5
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 26-DEC-1996