Document Page: First | Prev | Next | All | Image | This Release | Search

File: 970203_sep96_decls29_0011.txt
Page: 0011
Total Pages: 60

Subject: 92ND ENGR CBT BN HVY UNIT HISTORY                               

Unit: XVIII CORPS 

Parent Organization: ARCENT      

Box  ID: BX000072

Folder Title: PROBLEM WITH NBC PB PILLS-2 COPIES                                                              

Document Number:          1

Folder Seq  #:         19








           92nd received the mission to fly a 100 man element, with equipment,

           to begin crucial vertical construction missions in Eastern Saudi

           Arabia. This was to be in support of soldier Life Support Area

           (LSA) construction. Bravo Company was selected; however Time

           Phased Deployment List (TPFDL) manipulations changed the date and

           Bravo Company was sent as the first 92nd line company on 21 October

           1990.

                While line companies worked to finish deploying the 24th ID

           (MECH), the Headquarters and staff planned for the battalion's

           eventual deployment. Several engineer planning meetings were held

           at both Fort Bragg, North Carolina (20th Engineer Brigade) and Fort

           Benning, Georgia (36 Engineer Group); meanwhile, loadout of the

           92nd ECB (H) equipment began with railloads departing Ft.Stawart

           for JAXPORT, Jacksonville, Florida on 22 September. The ALEX

           BONNYMAN, the first of 11 ships began loading the battalion's

           equipment on 26 September, with the last ship,the BALDOMERO LOPEZ,

           finally loading on 23 October. A breakout of the 11 ships along

           with the number of major end items loaded on each vessel is in


           Annex D.























                                            9

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 60 f:/Week-48/BX000072/PROBLEM WITH NBC PB PILLS-2 COPIES/92nd engr cbt bn hvy unit history:01289718521931
Control Fields 17
File Room = sep96_declassified
File Cabinet = Week-48
Box ID = BX000072
Unit = XVIII CORPS
Parent Organization = ARCENT
Folder Title = PROBLEM WITH NBC PB PILLS-2 COPIES
Folder Seq # = 19
Subject = 92ND ENGR CBT BN HVY UNIT HISTORY
Document Seq # = 1
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 28-JAN-1997